This is the House that Roy and Verne Built: Part Two – Bricks and Mortar
Apologies and advance warnings; concrete proof – slab, soakpit and sewers; lonely brick storage site; Dino’s dilemma; men at work!; the sacred interstitial space; graffiti message, but not from us
Apologies if you’ve been eagerly awaiting This is the House that Roy and Verne Built: Part Two after the first in the series, Part One: Breaking Ground, which we celebrated back in April 2021. After the slab was laid in May, the site lay cold and abandoned until four months later when – spoiler alert! – the hoped-for, prayed-for and longed-for bricklayer team eventually came on site.
Now that we’re just about up to the second level, here’s the story of the build so far. Feel quite free to gloss over any dreary construction details (I know I would), and simply savour all my lovely photos of Roy.